How a job runs, what things cost, how long they take, licences, waterproofing and older houses, answered in our own words with the regulator's page linked for every rule. None of our own figures, because every job is quoted after a home visit.
23 articles, checked 24 November 2026

Ensuite with a white vanity, an arched mirror and a walk-in shower behind glass
Before you sign
How a job runs from the first call to handover, the licence to check, the home warranty, deposits and the paperwork you should get.
- How does a Naik's renovation run, from the first call to handover?Every Naik's job runs the same way. You ring or send an enquiry, Sally or Paul comes out to measure up, you get a quote that covers the job from start to finish, and a 5% deposit locks in your start date. After that the work goes in a set order, room by room, until we clean up and hand over the paperwork.Naik's Renovations · 12 November 2026
- Checking a renovator's QBCC licence before you signIn Queensland, building work valued over $3,300 needs a QBCC licence, and plumbing, drainage and gas fitting need one at any value. You can look any licence up on the QBCC's online register in a couple of minutes. Check that it's active, that the class covers the work you're getting done, and that the name on it is the name on your contract.Naik's Renovations · 7 November 2026
- Does QBCC home warranty insurance cover my renovation?Usually, yes. The QBCC says most residential building work in Queensland worth more than $3,300, including materials, labour and GST, has to be covered by QBCC home warranty insurance, and its list includes refitting a kitchen or bathroom. The cover is for non-completion on fixed-price contracts, defects and subsidence, within set time limits, and the QBCC decides whether a claim is covered.Naik's Renovations · 12 November 2026
- How do deposits and progress payments work on a Queensland renovation?On a Queensland renovation over $3,300, the deposit is generally capped by law: 10% of the contract price, or 5% once the contract reaches $20,000. After that, payments should be tied to stages of work that are actually finished, so what you've paid stays close to what's on site. In most cases you also have 5 business days after receiving the signed contract to change your mind.Naik's Renovations · 12 November 2026
- What paperwork should you get when a renovation finishes?For a bathroom, the paperwork that matters most is the waterproofing certificate and the plumbing Form 4. For a kitchen, add the warranties for the appliances. Depending on the job there can be more, especially when the work needed building approval and a certifier signed it off.Naik's Renovations · 12 November 2026
- Who should do your bathroom: a bathroom company, a plumber or a builder?It depends on how far the job goes. If you're swapping a tap or a toilet in the same spot, that's a plumber's job. If the whole room is coming out, someone has to run the plumber, the electrician, the waterproofing and the tiling in the right order, and if the job reaches past the tiles into the walls, the floor or the rooms around it, it's worth choosing a business whose QBCC licence covers building work as well as the trades.Naik's Renovations · 14 November 2026
- How do you compare two renovation quotes?Line them up item by item before you look at the totals. Two quotes are only comparable when they cover the same scope, the same materials and finishes, and a similar timeline. Then check what each one leaves out, what's an allowance rather than a price, and how the payments are staged. The QBCC recommends getting more than one quote and not choosing on price alone.Naik's Renovations · 24 November 2026
- What should you ask a renovation builder before you sign?Ask about the licence, the contract, the money and the people. Whose licence covers the job, what's in the contract and what isn't, how the deposit and progress payments work, when the home warranty premium is paid, how changes are handled, and who you ring when you have a question. Most of the answers can be checked against the QBCC's own guidance, and a good builder won't mind you checking.Naik's Renovations · 24 November 2026
Bathrooms and ensuites
What a bathroom costs, how long it takes and whether you can stay at home, leaking showers, small ensuites, two bathrooms at once, and the waterproofing you never see.
- How much does a bathroom renovation cost in the Redlands?Archicentre Australia's 2026 cost guide gives a typical range of $17,500 to $35,000 including GST for a bathroom or ensuite renovation. Where yours lands depends on the room, the house around it and what you choose to put in it. We price every bathroom after a home visit, because those things are different in every house.Naik's Renovations · 7 November 2026
- How long does a bathroom renovation take, and can we live at home?Most of our bathroom renovations take 2 to 4 weeks, depending on the size of the room and the materials you choose. Whether you can stay home through it comes down to how many showers and toilets you have, and what you've sorted out before the first tile comes off.Naik's Renovations · 7 November 2026
- Waterproofing a bathroom in Queensland: what's done, and the certificate you should getWaterproofing is the layer under the tiles that keeps water in the shower and out of the walls, floor and the room below. In Queensland, waterproofing work over $3,300 needs a QBCC licence, the work is done to the National Construction Code (its own Housing Provisions or Australian Standard AS 3740-2021), and when the waterproofing work is worth more than $3,300, a waterproofing certificate from a licensed contractor is required. Ask for it at handover and keep it with the house papers.Naik's Renovations · 7 November 2026
- Renovating two bathrooms: at the same time, or one after the other?Both can work, and the right answer depends on your household more than on the bathrooms. Doing them together means one round of trades and one stretch of disruption. Doing them one after the other means you always have a working shower and toilet in the house. It's one of the questions we're asked most, and we talk it through at the measure and quote visit.Naik's Renovations · 12 November 2026
- Leaking shower: repair it, or redo the bathroom?It depends on where the water is getting through and what it's already damaged, and that has to be assessed on site by a licensed waterproofer. If the leak is coming through the membrane under the tiles, the lasting fix is usually to take the shower back and waterproof it again. If the bathroom is old and tired anyway, that's often the point where a full renovation makes more sense than patching one corner of it.Naik's Renovations · 12 November 2026
- How do you renovate a small ensuite?You make the most of the space you've got, and where it isn't enough, you find more. Storage built into the wall, a walk-in shower instead of a framed one, and sometimes a wall moved to borrow space from the walk-in robe next door. Each of those changes the size of the job, so it's worth knowing which ones move the cost before you decide.Naik's Renovations · 12 November 2026
- Bathroom renovation mistakes we're asked to fixThe obvious one is a shower that leaks, and a leak through the membrane under the tiles usually can't be fixed from the top. The others are quieter: timber damage nobody planned for, a layout kept because it was already there, walls closed up before anyone thought about grab rails, and a job split between trades so nobody owned the result. Most of these are cheaper to avoid at the start than to put right later.Naik's Renovations · 14 November 2026
- Can you move the toilet and shower in a bathroom renovation?Usually, yes. Most bathrooms can take a new layout, but moving the toilet, shower or vanity is the biggest single thing that moves the cost of a bathroom, because the pipes and drainage have to move with them. How far they can go depends on your house, so it's something we check on site before we quote.Naik's Renovations · 24 November 2026
- What do you need to choose before a renovation starts, and when?Everything that's yours to choose: the tiles, tapware, vanity, toilet, shower screen and mirrors in a bathroom, and the cabinetry, benchtops, splashback, tapware and appliances in a kitchen. On our jobs we need your selections at least a week before we start, and longer when tiles or custom cabinetry have to be ordered in. Deciding before the start date is what keeps the job on time.Naik's Renovations · 24 November 2026
- Should you renovate the bathroom and laundry at the same time?Often, yes. A laundry and a bathroom are both wet areas under the National Construction Code, so they go through similar stages, and the two can run side by side through the same stages instead of one after the other months apart. The trade-off is more of the house out of action at once. Whether it suits you depends on your household, and on whether you can manage without a washing machine for a while.Naik's Renovations · 24 November 2026
Whole homes
What a whole-house renovation involves, and what to expect from a house built before 1990.
- Asbestos in older Redlands bathrooms and kitchens: what to expectIf your house was built before 1990, the Queensland Government says there's a good chance it contains asbestos, and the places it lists include wet area wall sheeting and under vinyl floors. That's no reason to put a renovation off. It means the asbestos has to be identified and removed properly before the room is stripped, and the cost and time of that belong in the plan from the start.Naik's Renovations · 7 November 2026
- What does a whole-house renovation involve, and how long does it take?A whole-house renovation takes most of the house back to its frame and rebuilds it room by room: the kitchen, bathrooms and laundry, the wall and ceiling linings, the floors, and often a wall or two moved to change how the house works. One we finished in October 2026, in Wellington Point, took about 3 months from start to finish. How long yours takes depends on how much of the house changes and what's found once it's opened up.Naik's Renovations · 12 November 2026
Kitchens
What's involved in a full kitchen, what moves the price, and what to line up before you compare quotes.
- How much does a kitchen renovation cost in the Redlands?Archicentre Australia's 2026 cost guide gives a typical range of $23,000 to $49,000 including GST for a kitchen renovation, and says to allow extra for white goods. Your kitchen will land wherever the layout, the cabinetry and the house around it put it. We quote every kitchen after a home visit, and the quote reflects the materials, finishes and scope you choose.Naik's Renovations · 7 November 2026
- What's involved in a full kitchen renovation?A full kitchen renovation takes the old kitchen out and builds a new one in its place: the layout, the cabinetry and benchtops, the plumbing and electrics behind them, and sometimes the walls around the room. We run every trade in the right order, from the strip-out to the appliances going in, so you deal with one builder instead of five. We've done around 40 kitchens, and that's the kind of kitchen job we take on.Naik's Renovations · 12 November 2026
- Taking a wall out for an open-plan kitchen: what's involved?Often it can come out, but what's involved depends on what the wall is doing. A wall that carries load is part of the structure, and taking it out usually needs building approval and a beam or other support in its place. A wall that doesn't carry load is a smaller job. Either way, the pipes, wiring and anything else inside it have to be dealt with first, so it's a question to answer on site before it's priced.Naik's Renovations · 24 November 2026


Got a question that isn't here?
Send your suburb, which rooms you're thinking about and a photo or two. Sally will call you to book a time for us to come out, and she'll answer the question while she's at it.
Or call Sally on 0452 647 579
SallyYour first point of contact
Let's talk about your vision
Step 1 of 5
The job