ThornlandsMain bathroomAn old bathroom with a leaking shower, given a new layout. Three and a half weeks on site, October 2026.Wellington Point whole house
- QBCC licensed builder 15254512
- 5.0 from 49 Google reviews
- Master Builders member
A very unkept house in need of a full renovation: three months, August to the end of October 2026, from the strip-out to the front fence.
Kitchen, bathroom, new ensuite, laundry, wardrobes, floors throughout and the front fence · 21 photos

Wellington Point open-plan kitchen and dining after the renovation, with new timber-look floors
What we did
Sally's words on the form: "A very unkept house in need of full renovation." It took about three months, from August to the end of October 2026.
Before and after
Room by room. Tap a photo to swap between before and after, or hold it to peek. The shots were taken from different spots, so they're not lined up.








Stage by stage: a full strip-out of the kitchen, bathroom and laundry, and the wall sheets and ceiling sheets in most of the house. Some walls moved. A new ensuite created. A new bathroom, new kitchen and new laundry. New fitted wardrobes. The front fence. New floors throughout.
- Rooms
- Kitchen, bathroom, new ensuite, laundry, wardrobes, floors throughout and the front fence
- Photos from
- Sally's own photos, November 2026
Next projects
ThornlandsMain bathroomAn old bathroom with a leaking shower, given a new layout. Three and a half weeks on site, October 2026.
Bathrooms and ensuitesA recent main bathroomSage stack tile, a fluted timber vanity, an arched mirror and bronze tapware.
Victoria PointWhole homeThe whole house, from demolition to the final coat of paint.Want something like this?
Send your suburb, which rooms you're thinking about and a photo or two. Sally will call to book a time for us to come out.
Or call Sally on 0452 647 579
SallyYour first point of contact
Let's talk about your vision
Step 1 of 5
The job












