Wellington PointWhole houseA very unkept house in need of a full renovation: three months, August to the end of October 2026, from the strip-out to the front fence.Two rooms into one bathroom, with green heritage tiles
- QBCC licensed builder 15254512
- 5.0 from 49 Google reviews
- Master Builders member
A separate toilet and bathroom knocked into one bigger room, with a green heritage tile shower and a freestanding bath.
Bathroom and separate toilet, made one room · 6 photos

Bathroom with a freestanding bath, timber vanity and green tiled shower
What we did
"Separate toilet and bathroom knocked into 1 bigger bathroom. Green Heritage tiles." Posted on Facebook on 18 July 2024.
Before and after
Room by room. Tap a photo to swap between before and after, or hold it to peek. The shots were taken from different spots, so they're not lined up.


The wall between the old toilet and bathroom came out. The new room has a walk-in shower in green heritage tiles, a freestanding bath and a timber vanity.
- Rooms
- Bathroom and separate toilet, made one room
- Photos from
- Facebook post, 18 July 2024
Next projects
Wellington PointWhole houseA very unkept house in need of a full renovation: three months, August to the end of October 2026, from the strip-out to the front fence.
ThornlandsMain bathroomAn old bathroom with a leaking shower, given a new layout. Three and a half weeks on site, October 2026.
Bathrooms and ensuitesA recent main bathroomSage stack tile, a fluted timber vanity, an arched mirror and bronze tapware.Want something like this?
Send your suburb, which rooms you're thinking about and a photo or two. Sally will call to book a time for us to come out.
Or call Sally on 0452 647 579
SallyYour first point of contact
Let's talk about your vision
Step 1 of 5
The job






