Should you renovate the bathroom and laundry at the same time?
- QBCC licensed builder 15254512
- 5.0 from 49 Google reviews
- Master Builders member
Often, yes. A laundry and a bathroom are both wet areas under the National Construction Code, so they go through similar stages, and the two can run side by side through the same stages instead of one after the other months apart. The trade-off is more of the house out of action at once. Whether it suits you depends on your household, and on whether you can manage without a washing machine for a while.
Naik's Renovations · Bathrooms and ensuites

Fluted timber vanity under an arched mirror, with sage green stack tiles in the shower
Why do the two rooms go well together?
Because they go through similar stages. The QBCC treats bathrooms, toilets and laundries as wet areas, and the National Construction Code sets out how they're waterproofed. The waterproofing requirements aren't identical (a shower has its own), but both rooms follow a similar order: strip-out, plumbing and electrical rough-in, sheeting, waterproofing, tiling, then the plumbing and electrical fit-off. When both are in the plan, the plumber, the waterproofer and the tiler can often move from one room to the other in the same visit.
It also means you only choose tiles and tapware once, and the two rooms can match. On some of our jobs the bathroom and laundry share the same tiles.
What's the catch?
More disruption at the same time. With the laundry out, the washing goes elsewhere for a while, and if the bathroom is your only one, you're also planning around showers. How long a bathroom takes, and living at home covers what to sort out when you're down to one bathroom, or none.
Selections matter more with two rooms too. We need them at least a week before the start date, and longer when tiles or custom cabinetry have to be ordered in. What to choose before a renovation starts has the list.
Can the laundry move?
Sometimes. Moving a laundry means moving its plumbing and drainage, and moving plumbing is the thing that moves the cost of our bathrooms most. It's licensed work at any value in Queensland, and the plumber registers it with the QBCC on a Form 4. You should get a copy at handover. On one of our jobs, an old toilet and shower next to the bathroom became the new laundry. Can you move the toilet and shower in a bathroom renovation? goes into what decides it.
If you're not sure whether your laundry can move, or whether it's worth doing both rooms together, give Sally a call on 0452 647 579 or send us a few photos.
What paperwork do I get?
A waterproofing certificate for the waterproofing, which the QBCC says is required when the waterproofing work is worth more than $3,300, and the plumber's Form 4 for the plumbing. Some jobs need other forms depending on the work. What paperwork you should get when a renovation finishes goes through each one.
From our jobs
In Birkdale we renovated the ensuite, the main bathroom and the laundry for one family in a single job. The main bathroom got a long double vanity under two round backlit mirrors and a walk-in shower with a lit niche. See the Birkdale job.
In Wavell Heights the bathroom got a corner spa bath, a glass shower and a long vanity, and next door the old toilet and shower became a new laundry, with a big new window. See the Wavell Heights job.
And in one kitchen, bathroom and laundry job, the bathroom and laundry share the new tiling, with the washing machine under the bench. See that job, or read about our laundry renovations and bathroom renovations.
Sources
Bathroom and laundry both due?
Sally is your first point of contact. She'll answer your questions and book a time for us to come out and see the room.
Bathroom and laundry both due?
Send your suburb, which rooms you're thinking about and a photo or two. Sally will call you to book a time for us to come out.
Or call Sally on 0452 647 579
SallyYour first point of contact
Let's talk about your vision
Step 1 of 5
The job