What's involved in a full kitchen renovation?
- QBCC licensed builder 15254512
- 5.0 from 49 Google reviews
- Master Builders member
A full kitchen renovation takes the old kitchen out and builds a new one in its place: the layout, the cabinetry and benchtops, the plumbing and electrics behind them, and sometimes the walls around the room. We run every trade in the right order, from the strip-out to the appliances going in, so you deal with one builder instead of five. We've done around 40 kitchens, and that's the kind of kitchen job we take on.
Naik's Renovations · Kitchens

New kitchen with white cabinets, timber floor and a black fridge
Do you do smaller kitchen jobs, like benchtops or new doors?
Not usually. We take on full kitchen renovations rather than swapping benchtops or doors on an existing kitchen. If that's all your kitchen needs, a specialist in that work will serve you better.
What happens in a full kitchen renovation?
It starts with the strip-out, when the old cabinets, benchtops and appliances come out and you see what the room is working with. Then the plumbing and electrical go where the new layout needs them, and any wall changes happen before the new linings go on. After that the cabinetry and benchtops go in, the plumbing and electrics are fitted off, and the appliances are installed.
Plumbing needs a licence in Queensland at any value, and the Electrical Safety Office's advice is to "always get a licensed electrician to do any electrical work". The plumbing and electrical are done by the licensed plumbers and electrician we work with, and we schedule every trade so each one arrives when the room is ready for them.
What do we have to decide before work starts?
Your selections: cabinetry, benchtops, splashback, tapware, appliances and finishes. We need them at least a week before the start date, and longer for custom cabinetry or anything that has to be ordered in, because those set the timeline for everything after them. Deciding early is the simplest way to keep the job on track.
Can we move the kitchen or take a wall out?
Yes, and it's one of the biggest decisions in a kitchen. Keeping the sink and cooktop where they are keeps most of the plumbing, gas and electrical where it is. Moving them, or taking a wall out to open the kitchen to the living room, makes the job bigger.
If the wall carries load, taking it out affects a structural part of the house and usually needs building approval through a building certifier. A like-for-like kitchen refit usually doesn't, because Queensland's Building Regulation treats alterations that don't touch the structure, floor area, height or fire safety as accepted work. Your house may be different, so a certifier or Redland City Council is the one to confirm it, and if you're not sure, ask Sally at the first call. In an older house it's also worth knowing what's in the walls. If your home was built before 1990, the Queensland Government says there's a good chance it contains asbestos, and asbestos in older Redlands bathrooms and kitchens explains what that means for a renovation.
What does a kitchen cost?
We quote every kitchen after a home visit, because the layout, the cabinetry and the benchtop are different in every house. How much a kitchen costs in the Redlands has the published ranges and what moves them.
What do we get at the end?
The warranties for your kitchen appliances, and the paperwork for the licensed work, such as the plumbing compliance paperwork. There may be other documents depending on the work, especially if it needed certification.
On most residential work over $3,300, including materials, labour and GST, the contractor has to take out QBCC home warranty insurance. We take it out on every residential job over that amount, kitchens included.
From our jobs
In Wellington Point the old kitchen had timber benchtops and dark marble-look floor tiles. Now it's white shaker cabinets with black benchtops, glass-front uppers, open shelving, pendant lights over the island and a wall oven tower. See the Wellington Point kitchen.
Also in Wellington Point, a whole-house renovation we finished in October 2026 started with a full strip-out of the kitchen, and the house got a new kitchen along with a new bathroom, ensuite and laundry. See the Wellington Point house.
If you'd like to see how a job runs from the first call, how a Naik's renovation runs goes through it step by step. Our kitchen renovations page has more of our kitchens.
Sources
- QBCC, "When you need a licence"
- Electrical Safety Office, "Don't do your own electrical work"
- Building Regulation 2021 (Qld), Schedule 1 s 7 (alterations not affecting a structural component)
- Redland City Council, "What approvals do I need?"
- Queensland Government, "Homeowners: look, check and prepare"
- QBCC, "What work requires insurance"
Thinking about a new kitchen in Cleveland or around the bay?
Sally is your first point of contact. She'll answer your questions and book a time for us to come out and see the room.
Thinking about a new kitchen in Cleveland or around the bay?
Send your suburb, which rooms you're thinking about and a photo or two. Sally will call you to book a time for us to come out.
Or call Sally on 0452 647 579
SallyYour first point of contact
Let's talk about your vision
Step 1 of 5
The job




