Does QBCC home warranty insurance cover my renovation?

Usually, yes. The QBCC says most residential building work in Queensland worth more than $3,300, including materials, labour and GST, has to be covered by QBCC home warranty insurance, and its list includes refitting a kitchen or bathroom. The cover is for non-completion on fixed-price contracts, defects and subsidence, within set time limits, and the QBCC decides whether a claim is covered.

Naik's Renovations · Before you sign

Victoria Point kitchen and dining room after the renovation

Who pays for the home warranty insurance?

The contractor takes out the policy and pays the premium to the QBCC, either before work starts or within 10 business days of signing the contract, whichever comes first. On our jobs that cost is built into your 5% deposit, so it's paid at the very start, and we take the cover out on every residential job over $3,300 including GST.

You don't apply for it yourself, and you shouldn't have to chase it. What you can do is ask your builder, before you sign, whether the job will be covered and when the premium will be paid. If you're not sure whether your job is the kind that needs cover, the QBCC's list of what work requires insurance is the official word, or ask Sally how it works on ours.

What does it actually cover?

The QBCC lists three main things: a job that isn't finished, defective work, and subsidence. A claim pays up to $200,000, and some exclusions apply. Non-completion cover applies to fixed-price contracts, so it's there if the builder can't finish the job, for example because they've become insolvent. Defects and subsidence cover is there if something isn't right and the builder doesn't fix it.

It isn't a general warranty on everything in the house, and it doesn't replace your contract. It's a safety net that sits behind the builder.

How long does the cover last?

The scheme runs for 6 years and 6 months, but the time limit depends on the kind of defect. A structural defect has to be noticed within 6 years and 6 months of the cover starting, and the claim made within 3 months of noticing it.

Non-structural defects are much tighter. They have to be noticed within 6 months after the work is substantially complete, and the claim made within 7 months after substantial completion. That's the one people miss. A cracked tile or a door that won't close properly is something to raise early, not something to save up for later. If you're not sure whether something counts or whether you're still in time, the QBCC is the one to ask (139 333). If it's one of our jobs, ring Sally first and we'll come and have a look.

How do I check a builder can take it out?

Check their licence first. The QBCC register shows whether a licence is active and what classes it covers. Checking a renovator's QBCC licence walks through it step by step.

Then ask how the deposit is set up. The law caps deposits on regulated contracts, and a builder asking for far more up front is a reason to slow down. Our article on deposits and progress payments has the limits and how our stages work.

What should I keep once the job's done?

Keep the contract, the handover paperwork and a note of the completion date. The completion date is what the non-structural time limit runs from, and the certificates are what you'll need if anything comes up later. What paperwork you should get when a renovation finishes lists what to ask for.

From our jobs

In Victoria Point we renovated a whole home: four bedrooms, the main bathroom, ensuite, toilet and laundry, the kitchen and dining room, and the living area. Every residential job we do over $3,300 including GST gets home warranty cover before the work starts. See the Victoria Point job, or read about whole-home renovations and bathroom renovations.

Planning a renovation in Cleveland or around the bay?

Sally is your first point of contact. She'll answer your questions and book a time for us to come out and see the room.

Planning a renovation in Cleveland or around the bay?

Send your suburb, which rooms you're thinking about and a photo or two. Sally will call you to book a time for us to come out.

Or call Sally on 0452 647 579

Sally
Your first point of contact

Let's talk about your vision

Step 1 of 5

The job

What's the job?

Pick as many as you need. The next step asks about each one.