Often it can come out, but what's involved depends on what the wall is doing. A wall that carries load is part of the structure, and taking it out usually needs building approval and a beam or other support in its place. A wall that doesn't carry load is a smaller job. Either way, the pipes, wiring and anything else inside it have to be dealt with first, so it's a question to answer on site before it's priced.

Naik's Renovations · Kitchens

Fluted timber vanity under an arched mirror, with sage green stack tiles in the shower

How do I know if the wall carries load?

You can't tell for sure by looking at it from the room. What sits above it, which way the ceiling and roof framing run, and how the house was built all decide it, and that's for a builder to confirm once they've seen the house, usually with a structural engineer, while the certifier confirms the approval. It's one of the first things we look at when a kitchen job includes a wall.

Does taking a wall out need approval?

It depends on the wall. Under Queensland's Building Regulation, repairs and alterations to a house generally don't need building approval unless they change the floor area or height, affect a structural component (some minor ones are allowed), or affect fire safety. Taking out a wall that carries load affects a structural component, so it usually needs approval through a building certifier.

This is general information, not advice for your house. A certifier or Council is the one to confirm what your job needs, and we work it out with you at the quote stage. If you're not sure before then, give Sally a call on 0452 647 579.

What's inside the wall?

Usually more than people expect. Power points, light switches and their wiring often run through a kitchen wall, and sometimes water pipes too. They all have to be moved or removed before the wall comes out, and that's licensed work: the Electrical Safety Office's advice is to "always get a licensed electrician to do any electrical work", and plumbing needs a QBCC licence at any value. The Electrical Safety Office also warns about wiring hidden in wall cavities when cutting holes, which is another reason this isn't a weekend job.

In an older house, the wall sheeting itself can be the issue. If your home was built before 1990, the Queensland Government says there's a good chance it contains asbestos, and wall sheeting is one of the places it lists. Asbestos in older Redlands bathrooms and kitchens explains what that means before anything is pulled down.

Why does moving a wall move the price?

Because it touches several trades at once. The wall comes out, a beam or new framing may go in, the ceiling and floor are patched where the wall stood, and the power and plumbing are rerouted. Moving walls is one of the three things that move the cost of our jobs most, after moving plumbing and putting in cavity sliding doors. How much a kitchen costs in the Redlands has the published ranges.

When should the wall come out?

Early, after the strip-out and before the new kitchen goes in. The order on a kitchen is the old cabinets and benchtops out, then any wall changes, then the plumbing and electrical where the new layout needs them, then the linings, cabinetry and benchtops. What's involved in a full kitchen renovation goes through the whole job.

Is it worth it?

Often, yes. A closed-in kitchen next to the dining or living room can feel like two small rooms, and opening them up changes how the house works. It's also one of the bigger decisions in a renovation, so it's worth knowing what's in the wall and what approval it needs before you plan the rest of the kitchen around it.

From our jobs

At Wellington Point, between August and the end of October 2026, we did a whole-house renovation that included moving some walls, along with a new kitchen, bathroom, ensuite and laundry. See the Wellington Point house, the Wellington Point kitchen, or our kitchen renovations page.

Thinking about opening up the kitchen?

Sally is your first point of contact. She'll answer your questions and book a time for us to come out and see the room.

Thinking about opening up the kitchen?

Send your suburb, which rooms you're thinking about and a photo or two. Sally will call you to book a time for us to come out.

Or call Sally on 0452 647 579

Sally
Your first point of contact

Let's talk about your vision

Step 1 of 5

The job

What's the job?

Pick as many as you need. The next step asks about each one.