What do you need to choose before a renovation starts, and when?

Everything that's yours to choose: the tiles, tapware, vanity, toilet, shower screen and mirrors in a bathroom, and the cabinetry, benchtops, splashback, tapware and appliances in a kitchen. On our jobs we need your selections at least a week before we start, and longer when tiles or custom cabinetry have to be ordered in. Deciding before the start date is what keeps the job on time.

Naik's Renovations · Bathrooms and ensuites

Fluted timber vanity under an arched mirror, with sage green stack tiles in the shower

What counts as a selection?

Anything you'll see and use once the job's finished. For a bathroom that's usually:

  • the floor and wall tiles
  • the tapware and shower fittings
  • the vanity and basin
  • the toilet
  • the shower screen
  • the mirror, towel rails and toilet roll holder

For a kitchen it's the cabinetry, the benchtops, the splashback, the sink and tapware, the appliances and the finishes. The layout and colours come first, and we talk them through at the measure and quote visit, so the selections follow from a plan you've already agreed.

Why do you need them a week before the start?

Because each stage of the job is built around them. The plumbing is roughed in to suit the tapware and the toilet you've chosen, the timber framing for niches and recessed cabinets is built to their size, and the tiler needs the tiles on site when the waterproofing's done. If a selection arrives late, every stage after it can move.

Which choices take longer?

Tiles and custom cabinetry are the two to sort out first. Tiles that have to be ordered in, and cabinetry made to measure, can take longer than a week to arrive, so ask Sally which of your choices to settle early. If you're not sure how long something you've got your eye on will take, ask Sally before you fall in love with it. She'll tell you whether it's likely to hold up the start.

What if I change my mind once work has started?

It can usually be done, but it becomes a variation. The QBCC says the builder has to put a variation to you in writing, generally before that work starts or within 5 business days of agreeing it, whichever comes first, and you reply in writing, and that undocumented variations are a common cause of budget blow-outs and disputes. A different tile or a moved tap can also push back every stage after it, so the earlier a change is made, the less it costs in time.

Are the fixtures in the quote?

On our jobs, yes. Our quote covers the job from start to finish, including the fixtures and fittings. Not every quote does, so when you're comparing, check whether each one includes them, or uses an allowance (often called a prime cost or provisional sum) that may or may not cover what you actually pick. The QBCC suggests asking each builder to confirm the materials and finishes in their quote, and what product warranties come with them. How to compare two renovation quotes goes through it.

Where should I start?

With photos. A screenshot of a bathroom or kitchen you like is a good place to start, even a rough one, and it's the quickest way to show us what you mean. If you're not sure where to begin, send us a few photos or give Sally a call on 0452 647 579, and we'll talk it through at the home visit.

From our jobs

At Wellington Point the old kitchen had timber benchtops and dark marble-look floor tiles. The selections that replaced them were white shaker cabinets, black benchtops, glass-front uppers, open shelving, pendant lights over an island with seating, and a wall oven tower. See the Wellington Point kitchen.

How a Naik's renovation runs shows where selections sit in the job, and our bathroom renovations and kitchen renovations pages have more of our work.

Want to talk through your selections?

Sally is your first point of contact. She'll answer your questions and book a time for us to come out and see the room.

Want to talk through your selections?

Send your suburb, which rooms you're thinking about and a photo or two. Sally will call you to book a time for us to come out.

Or call Sally on 0452 647 579

Sally
Your first point of contact

Let's talk about your vision

Step 1 of 5

The job

What's the job?

Pick as many as you need. The next step asks about each one.