Thornlands main bathroom

An old bathroom with a leaking shower, given a new layout. Three and a half weeks on site, October 2026.

Main bathroom · 5 photos

Thornlands main bathroom after, with a bath, walk-in shower behind glass and a white vanity

What we did

An old bathroom with a leaking shower. We changed the layout, and the job took three and a half weeks on site in October 2026.

Thornlands, after

Before and after

Room by room. Tap a photo to swap between before and after, or hold it to peek. The shots were taken from different spots, so they're not lined up.

Thornlands bathroom after, the bath and vanity under the window
Bath and vanity
Bath and vanity, after the renovation
Thornlands walk-in shower after, with a rail shower and new floor tiles
Shower
Shower, after the renovation

Every bathroom we do runs in the same order: strip out and check the floor and timbers, rough in the plumbing and electrics for the new layout, frame any niches, strengthen the walls where grab rails could go later, sheet, waterproof, tile, fit off, screen, rails and mirrors, then clean.

Rooms
Main bathroom
Photos from
Sally's own photos, November 2026

Want something like this?

Send your suburb, which rooms you're thinking about and a photo or two. Sally will call to book a time for us to come out.

Or call Sally on 0452 647 579

Sally
Your first point of contact

Let's talk about your vision

Step 1 of 5

The job

What's the job?

Pick as many as you need. The next step asks about each one.