Bathroom renovation mistakes we're asked to fix

The obvious one is a shower that leaks, and a leak through the membrane under the tiles usually can't be fixed from the top. The others are quieter: timber damage nobody planned for, a layout kept because it was already there, walls closed up before anyone thought about grab rails, and a job split between trades so nobody owned the result. Most of these are cheaper to avoid at the start than to put right later.

Naik's Renovations · Bathrooms and ensuites

Fluted timber vanity under an arched mirror, with sage green stack tiles in the shower

Why does a shower leak?

Because tiles and grout aren't waterproof on their own. Water gets through the grout lines and around the fittings every time the shower runs, and what stops it is the membrane underneath. Under NCC 2022 shower walls are waterproofed to 1800 mm, and if there's a floor waste the floor has to fall to it. When the membrane is missing, damaged or stops short, the water keeps going into the framing, the floor or the room below.

In Thornlands, in October 2026, we renovated an old main bathroom with a leaking shower. We changed the layout while the room was back to the frame, and it took three and a half weeks on site. See the Thornlands bathroom.

Can't you re-grout or tile over it?

Usually not, if the water is getting through the membrane. New grout or new tiles on top look better for a while and leave the cause where it was. The lasting fix is to take the shower back, deal with the damage underneath and waterproof it again before it's tiled. Our article on a leaking shower: repair or redo goes through how to tell which one you've got. If you're not sure, send Sally a few photos or give her a call on 0452 647 579.

What gets missed when the old room comes out?

The floor and the timbers. Every bathroom we do starts with the strip-out, then we check the floor and timbers and repair them if they need it. Water damage to timbers is the one thing nobody can price before the room's opened up, so it isn't in our quote. If we find it, we talk it through with you: what's needed and what it'll cost.

The mistake is pretending it won't be there. A quote that doesn't say how it handles damaged timber is a quote that will surprise you later.

Is keeping the old layout a mistake?

Not always, but it's worth asking whether the layout works before you spend the money on new tiles. If your house has a small bathroom with a separate toilet next to it, or an ensuite squeezed into a corner, either can often change.

We took the wall out between a separate toilet and bathroom and made one bigger room, with a walk-in shower in green heritage tiles and a freestanding bath. See the two rooms made into one.

We turned a small ensuite into a large one by extending into the walk-in robe: a walk-in shower, a white vanity under an arched mirror and dark large-format floor tiles. See the ensuite extended into the robe.

Moving plumbing, cavity sliding doors and moving walls are the three things that move the price most, so a layout change is a real cost. It's still cheaper than renovating the same awkward room twice.

What should go in the walls before they're closed up?

Anything you might want later. Once the walls are sheeted, waterproofed and tiled, adding to them means taking tiles off. On every bathroom we frame the timber for niches and recessed cabinets, and we strengthen the walls where grab rails could go later, before the sheeting goes on. If a grab rail is ever needed, it has something solid to fix to.

Why does splitting the job between trades go wrong?

Because when the plumber, the waterproofer, the tiler and the carpenter are booked separately, the order and the finish are yours to manage, and a problem between two of them belongs to neither. That's why we don't take part of a bathroom, like the framing and waterproofing only while someone else does the rest. We run the whole room and stand behind it. Who should do your bathroom goes through what each kind of business can take on.

What paperwork tells you it was done right?

When the waterproofing work is worth more than $3,300, the QBCC says a waterproofing certificate is required, issued by a licensed contractor. Most renovation plumbing is notifiable work, which comes with the plumber's Form 4. At the end of one of our bathrooms you get both, and there may be other documents depending on the work. If a bathroom you're buying or fixing has neither, ask why. What paperwork you should get at handover has the full list. Our bathroom renovations page shows the rest of our work.

Got a bathroom that needs putting right?

Sally is your first point of contact. She'll answer your questions and book a time for us to come out and see the room.

Got a bathroom that needs putting right?

Send your suburb, which rooms you're thinking about and a photo or two. Sally will call you to book a time for us to come out.

Or call Sally on 0452 647 579

Sally
Your first point of contact

Let's talk about your vision

Step 1 of 5

The job

What's the job?

Pick as many as you need. The next step asks about each one.