What does a whole-house renovation involve, and how long does it take?

A whole-house renovation takes most of the house back to its frame and rebuilds it room by room: the kitchen, bathrooms and laundry, the wall and ceiling linings, the floors, and often a wall or two moved to change how the house works. One we finished in October 2026, in Wellington Point, took about 3 months from start to finish. How long yours takes depends on how much of the house changes and what's found once it's opened up.

Naik's Renovations · Whole homes

Bedroom with new timber flooring and teal curtains

What's included in a whole-house renovation?

Whatever the house needs, and it's usually more than one room. At Wellington Point it meant a full strip-out of the kitchen, the bathroom and the laundry, and the wall and ceiling sheets in most of the house. Some walls were moved. We created a new ensuite and built a new bathroom, a new kitchen and a new laundry, fitted new wardrobes, put in new floors throughout and built a new front fence.

That's the kind of work we want more of. One builder running the whole house means one quote, one timeline and one person to ring, instead of separate trades each working around the others.

How long does a whole-house renovation take?

Wellington Point took about 3 months, from August to the end of October 2026. A smaller scope takes less and a bigger one takes more, and we talk through how long yours will take at the measure and quote visit. The things that stretch it are the same as in a single room: what turns up once the linings come off, items that have to be ordered in, and changes once work has started.

In what order does it happen?

Strip-out first, so the house is back to the frame and we can see what it's working with. Then the timber gets checked and repaired where it needs it, walls are moved, and the plumbing and electrical go in where the new layout needs them. The linings go back on, the wet areas are waterproofed and tiled, the kitchen and wardrobes are installed, and the trades fit off. Floors and finishing come towards the end so they aren't damaged by the work around them.

The plumbing and electrical are done by the licensed plumbers and electrician we work with, alongside our own carpenters and the tilers we work with, and we schedule them in the right order to keep delays to a minimum.

Do we need council approval?

It depends on what changes, and it's worth getting a firm answer for your house. Under Queensland's Building Regulation, repairs and alterations generally don't need building approval unless they change the floor area or height, affect a structural component (some minor ones are allowed), or affect fire safety. Taking out a load-bearing wall usually needs approval through a building certifier. If your house is on Redland City Council's local heritage register, some work may need approval too, and Council asks owners who aren't sure to contact them.

A building certifier or Council is the one to confirm it. We work out what your job needs at the quote stage, and if you're not sure before then, give Sally a call on 0452 647 579.

What about asbestos in an older house?

If your house was built before 1990, the Queensland Government says there's a good chance it contains asbestos, including in wet area wall sheeting and under vinyl floors. A whole-house job disturbs a lot of linings, so it's worth knowing early. Naik's Renovations holds asbestos licence 2327241, and we often bring in a subcontractor for the removal itself. Asbestos in older Redlands bathrooms and kitchens explains what to expect.

Can we live in the house while it's done?

With a whole-house job, often not for all of it, because the kitchen, bathroom and laundry are out at the same time. It's something to plan before the start date, and we talk it through at the home visit.

From our jobs

The Wellington Point house was a very unkept house in need of a full renovation. Over about 3 months it got a new kitchen, a new bathroom, a new ensuite where there wasn't one, a new laundry, fitted wardrobes, new floors throughout and a front fence, with some walls moved along the way. See the Wellington Point house.

In Victoria Point we renovated an entire home, from demolition to painting: 4 bedrooms, the main bathroom, ensuite, toilet and laundry, the kitchen and dining room, and the living area. See the Victoria Point home.

If the kitchen is a big part of your plans, what's involved in a full kitchen renovation goes into it, and how a Naik's renovation runs walks through every step from the first call. Our whole-home renovations page has more of our work.

Thinking about renovating the whole house?

Sally is your first point of contact. She'll answer your questions and book a time for us to come out and see the room.

Thinking about renovating the whole house?

Send your suburb, which rooms you're thinking about and a photo or two. Sally will call you to book a time for us to come out.

Or call Sally on 0452 647 579

Sally
Your first point of contact

Let's talk about your vision

Step 1 of 5

The job

What's the job?

Pick as many as you need. The next step asks about each one.