How much does a bathroom renovation cost in the Redlands?
- QBCC licensed builder 15254512
- 5.0 from 49 Google reviews
- Master Builders member
Archicentre Australia's 2026 cost guide gives a typical range of $17,500 to $35,000 including GST for a bathroom or ensuite renovation. Where yours lands depends on the room, the house around it and what you choose to put in it. We price every bathroom after a home visit, because those things are different in every house.
Naik's Renovations · Bathrooms and ensuites

Birkdale main bathroom with a double vanity and two round backlit mirrors
What do the published ranges say?
Two published sources are worth knowing. Archicentre Australia's CostGuide 2026 puts a bathroom or ensuite at $17,500 to $35,000, including GST. Canstar, citing hipages data in July 2026, gives a wider spread of about $8,000 to $35,000.
Both are national figures. They're useful for knowing whether a number is in the right territory, and that's about all. Neither has seen your bathroom, and neither knows what's behind the tiles.
What is a realistic budget for a bathroom renovation?
It depends on how much of the room changes. Canstar, citing Three Birds Renovations, splits bathrooms roughly into three tiers, each of which "might involve" the work below:
- Basic, $8,000 to $15,000: a cosmetic job in a smaller room, with no changes to the wiring or plumbing and entry-level fittings.
- Standard, $15,000 to $35,000: an average-sized room with minor changes to the wiring and plumbing, and mid-range fittings.
- Premium, $35,000 and up: a complete overhaul, with major relocations of the plumbing and electrical.
Archicentre's $17,500 to $35,000 sits across the standard tier. A realistic budget starts from which tier your room is in: whether anything moves, how big it is, and what you want in it. If you're not sure where yours sits, send Sally a few photos or give her a call on 0452 647 579. The home visit is where we work out the real number.
Can I renovate a bathroom for $10,000?
On the published figures, $10,000 sits inside Canstar's basic tier: a cosmetic refresh of a smaller room where the plumbing and wiring stay put and the fittings are entry-level. It sits below Archicentre's range for a bathroom or ensuite. Once the room is stripped back, waterproofed again or the layout changes, the figures move into the standard tier or above. Whether a job that size is one we take on is covered in how a Naik's renovation runs.
What is the most expensive part of a bathroom renovation?
Neither guide puts a dollar figure on each part. Canstar names the size of the room, moving plumbing, electrical points or windows, new waterproofing and tiles, and high-end fittings as the big drivers. In our bathrooms, the things that move the price most, heaviest first, are:
- Moving the plumbing. When the shower, toilet or vanity moves, the pipes and drainage move with it.
- Cavity sliding doors. The wall has to be opened and reframed to take the cavity.
- Moving walls. Joining a separate toilet to the bathroom, or borrowing space from a robe, changes the framing.
- The fixtures and fittings you choose.
- The tiles you choose.
So the most expensive bathroom is usually the one where things move, not the one with the dearest tapware.
Why won't my quote match a figure off the internet?
A bathroom quote has to account for things no average can. These are the ones that change a number most often.
Whether things move. Keeping the shower, toilet and vanity where they are is a different job from moving them. When they move, the plumbing and drainage move too, and plumbing is licensed work in Queensland at any value.
The floor and walls. What the room's built on, and what's under the existing tiles, sets how much preparation happens before anything new goes in.
What you choose. Tiles, tapware, the vanity, the screen and lighting are the part you control. Two bathrooms the same size can end up a long way apart on fittings alone.
Waterproofing. It has to be done by a licensed contractor to the standard, and when the waterproofing work is worth more than $3,300, a waterproofing certificate is required. It's the part of a bathroom you never see, and the last place to look for a saving. Our article on waterproofing a bathroom in Queensland explains what's involved.
The age of the house. Archicentre's guide says to allow extra for asbestos removal. If your house was built before 1990, the Queensland Government says there's a good chance it contains asbestos, and wet area wall sheeting is one of the places it lists. More on that in asbestos in older Redlands bathrooms and kitchens.
What should a bathroom quote show?
A quote you can compare with another one shows the scope room by room, what's included and what isn't, and the timeline in writing. Look for these:
- the work itself, from strip-out to fit-off
- any allowances for items you haven't chosen yet (often called prime cost or provisional sums), and how much each one is
- the waterproofing, who's doing it and the certificate you'll get
- the shower screen, if it's part of the job
- how payments are staged
If the job is over $3,300 it's a regulated contract under Queensland law. The deposit is capped at 10% of the contract price, or 5% once the contract reaches $20,000. In most cases you can also withdraw within 5 business days of receiving the signed contract. The QBCC's deposits and cooling-off pages have the details and the exceptions.
Why is the cheapest quote often not the cheapest job?
Quotes differ for honest reasons: different fittings, a different scope, a different way of doing the waterproofing. They also differ because something's been left out or allowed for at a figure that won't cover it. A low allowance for tiles or tapware looks good on paper and comes back as a variation once you've chosen what you actually want.
So read the inclusions line by line before you compare totals. If one quote is well under the others, ask what it doesn't include.
Will the job be covered if something goes wrong?
On most residential work over $3,300, including materials, labour and GST, the contractor has to take out QBCC home warranty insurance. The contractor pays the premium, before work starts or within 10 business days of signing. We take it out on every residential job over that amount.
From our jobs
We've done around 150 bathrooms. In Birkdale we renovated the ensuite, the main bathroom and the laundry for one family in a single job. The main bathroom got a long double vanity under two round backlit mirrors, a walk-in shower with a lit niche and black tapware, and large-format floor tiles. See the Birkdale job.
What happens next?
We come to your home, look at the room, measure up and talk through what you want. Then we prepare the design and a detailed quote. Most of our bathrooms take 2 to 4 weeks, and how long a bathroom takes goes through what happens in that time. How a Naik's renovation runs has every step from the first call to handover, and our bathroom renovations page has the jobs we've done.
Sources
- Archicentre Australia, CostGuide 2026 (costs include GST)
- Canstar, "Bathroom renovation cost", 24 Jul 2026, citing hipages (overall range) and Three Birds Renovations (the three tiers)
- QBCC, "When you need a licence"
- QBCC, "Handover and final documentation" (waterproofing certificate)
- QBCC, "What work requires insurance"
- QBCC, "Who pays the premium"
- QBCC, "Deposits and progress payments"
- QBCC, "Cooling-off period"
- QBCC Regulation 2018 s 45 (level 2 amount, $20,000)
- Queensland Government, "Homeowners: look, check and prepare"
Thinking about a bathroom in Cleveland or around the bay?
Sally is your first point of contact. She'll answer your questions and book a time for us to come out and see the room.
Thinking about a bathroom in Cleveland or around the bay?
Send your suburb, which rooms you're thinking about and a photo or two. Sally will call you to book a time for us to come out.
Or call Sally on 0452 647 579
SallyYour first point of contact
Let's talk about your vision
Step 1 of 5
The job